Production month March 1, 2026: 241 bbl oil, 0 Mcf gas, 12715 bbl water.
How to use this Loving County page
Start with the metrics, then compare top operators, top fields, recent activity, and linked well records. If you have an API number, open the well page directly. If you only have a lease, operator, field, abstract, block, section, or survey clue, use this page as a county-level starting point before reviewing source documents.
Open the paginated SEO well list, browse statewide activity, or review data sources.
Recent Loving County activity
Production month March 1, 2026: 37 bbl oil, 0 Mcf gas, 2271 bbl water.
Production month March 1, 2026: 0 bbl oil, 0 Mcf gas, 120 bbl water.
Production month March 1, 2026: 3 bbl oil, 0 Mcf gas, 390 bbl water.
Production month March 1, 2026: 19 bbl oil, 0 Mcf gas, 1390 bbl water.
Production month March 1, 2026: 2 bbl oil, 0 Mcf gas, 1210 bbl water.
Production month March 1, 2026: 47 bbl oil, 0 Mcf gas, 1859 bbl water.
Production month March 1, 2026: 9 bbl oil, 0 Mcf gas, 240 bbl water.
Recent W-1 permit signals
Permit signal derived from a W-1 or drilling-permit document linked to a public well card.
Permit signal derived from a W-1 or drilling-permit document linked to a public well card.
Permit signal derived from a W-1 or drilling-permit document linked to a public well card.
Permit signal derived from a W-1 or drilling-permit document linked to a public well card.
Permit signal derived from a W-1 or drilling-permit document linked to a public well card.
Permit signal derived from a W-1 or drilling-permit document linked to a public well card.
Permit signal derived from a W-1 or drilling-permit document linked to a public well card.
Permit signal derived from a W-1 or drilling-permit document linked to a public well card.
Recent completion reports
Non-zero production month detected from production records.
Non-zero production month detected from production records.
First non-zero production month detected from production records.
First non-zero production month detected from production records.
Non-zero production month detected from production records.
First non-zero production month detected from production records.
Non-zero production month detected from production records.
First non-zero production month detected from production records.
P-4 operator changes, plugging, and technical documents
GIS API record shows a plug date for CBR 6.
GIS API record shows a plug date for LINDSAY 10-15H.
GIS API record shows a plug date for MENTONE BRINE WELL.
GIS API record shows a plug date for LINDLEY 54-2-44 LOV.
GIS API record shows a plug date for TUNSTILL UNIT.
GIS API record shows a plug date for FORD CHAPMAN UNIT.
GIS API record shows a plug date for TUNSTILL UNIT.
GIS API record shows a plug date for TUNSTILL UNIT.
Recently completed wells
Loving County - WATERBRIDGE STATELINE LLC - PONDITO (CHERRY CANYON)
Loving County - WATERBRIDGE STATELINE LLC - PONDITO (CHERRY CANYON)
Loving County - WATERBRIDGE STATELINE LLC - PONDITO (CHERRY CANYON)
Loving County - WATERBRIDGE STATELINE LLC - HUBBARD (CHERRY CANYON)
Loving County - NGL WATER SOLUTIONS PERMIAN, LLC - SANDBAR (BONE SPRING)
Loving County - SOLARIS WATER MIDSTREAM, LLC - EL MAR (DELAWARE)
Loving County - SOLARIS WATER MIDSTREAM, LLC - MASON
Loving County - NGL WATER SOLUTIONS PERMIAN, LLC - EL MAR (DELAWARE)
Recently producing wells
No matching wells are linked in the current county dataset yet.
Related operators, fields, wells, and activity
Loving County well research questions
How do I find wells in this county?
In Loving County, surface locations can be especially misleading for horizontal wells, so review plats, permits, directional surveys, and completion documents where available. Use API numbers when available, then compare operator, lease, field, county, and activity records.
Does a permit mean a well will be drilled?
No. A permit is a public activity signal, not a guarantee of drilling, completion, production, economics, or timing.
Are map boundaries official?
No. Map points and estimated areas are discovery aids. They are not official parcel, survey, mineral, lease, or title boundaries.
Where should I verify official records?
Verify important facts with official Railroad Commission systems, original source documents, county records, and qualified legal, land, title, engineering, or tax professionals.