Permit records can indicate requested drilling, recompletion, deepening, or related work, but do not guarantee drilling or production.
Known public record details
Location summary
Public records currently place this well in Frio County. Surface locations can be incomplete or misleading for horizontal wells, so verify official plats, directional surveys, completion records, and source documents before relying on a map point.
Well lifecycle timeline
Completion filings can show that a well moved from permitted or drilled status into a completed well record.
Production signals help identify wells with linked monthly production or derived producing status.
P-4 activity can indicate operator, lease, gatherer, purchaser, or responsibility changes tied to the record.
Plugging notices and plugging records help distinguish planned plugging from wells already reported as plugged.
Directional surveys, plats, and L-1 records can be important for understanding horizontal wells beyond the surface point.
Recent activity timeline
W-2 completion report
Cementing report filed. A W-15 alone is technical cementing context and is not treated as a plugged-well record without W-3 or other plugging support.
Frio County
Cementing report filed. A W-15 alone is technical cementing context and is not treated as a plugged-well record without W-3 or other plugging support.
Frio County
W-2 completion report
Potential test date January 1, 2026-22. Calculated 24-hour rate: oil 709 bbl, gas 381 mcf, water 1056 bbl. Test period: oil 709 bbl, gas 381 mcf, water 1056 bbl.
Effective November 1, 2025-07. Lease THUNDERBIRD 101HZ.