Test date June 1, 2026-04. 24-hour test: gas 4747 mcf, condensate/oil 929 bbl, water 5154 bbl. Gas/liquid ratio 60 cf/bbl. Gas specific gravity 0.720. Flowing tubing pressure 469 psia. Casing pressure 459 psia. Shut-in wellhead pressure 40 psia. Separator pressure 266 psia. Choke size 104/104.
Texas Technical Well Document Activity
Cementing report filed. A W-15 alone is technical cementing context and is not treated as a plugged-well record without W-3 or other plugging support.
Test date June 1, 2026-04. 24-hour test: gas 6347 mcf, condensate/oil 974 bbl, water 4397 bbl. Gas/liquid ratio 60 cf/bbl. Gas specific gravity 0.725. Flowing tubing pressure 477 psia. Casing pressure 467 psia. Shut-in wellhead pressure 40 psia. Separator pressure 263 psia. Choke size 104/104.
Cementing report filed. A W-15 alone is technical cementing context and is not treated as a plugged-well record without W-3 or other plugging support.
Cementing report filed. A W-15 alone is technical cementing context and is not treated as a plugged-well record without W-3 or other plugging support.
Grouped from highly similar texas technical well document activity records by API, event date, source form, operator, county, field, and event type. Source trace: rrc_document_archive.
G-10 gas well status report
Test date December 1, 2025-06. 24-hour test: gas 3326 mcf, condensate/oil 1024 bbl, water 7772 bbl. Gas/liquid ratio 0 cf/bbl. Gas specific gravity 0.000. Flowing tubing pressure 10 psia. Casing pressure 701 psia. Shut-in wellhead pressure 40 psia. Separator pressure 300 psia. Choke size 128.
Grouped from highly similar texas technical well document activity records by API, event date, source form, operator, county, field, and event type. Source trace: rrc_document_archive.
Directional survey
G-10 gas well status report
Test date November 1, 2025-27. 24-hour test: gas 5880 mcf, condensate/oil 1240 bbl, water 8963 bbl. Gas/liquid ratio 0 cf/bbl. Gas specific gravity 0.000. Flowing tubing pressure 10 psia. Casing pressure 976 psia. Shut-in wellhead pressure 40 psia. Separator pressure 341 psia. Choke size 128.
Grouped from highly similar texas technical well document activity records by API, event date, source form, operator, county, field, and event type. Source trace: rrc_document_archive.
G-10 gas well status report
Test date October 1, 2025-24. 24-hour test: gas 9053 mcf, condensate/oil 738 bbl, water 5924 bbl. Gas/liquid ratio 0 cf/bbl. Gas specific gravity 0.000. Flowing tubing pressure 946 psia. Casing pressure 946 psia. Shut-in wellhead pressure 40 psia. Separator pressure 300 psia. Choke size 64.
Cementing report filed. A W-15 alone is technical cementing context and is not treated as a plugged-well record without W-3 or other plugging support.
Grouped from highly similar texas technical well document activity records by API, event date, source form, operator, county, field, and event type. Source trace: rrc_document_archive.
Grouped from highly similar texas technical well document activity records by API, event date, source form, operator, county, field, and event type. Source trace: rrc_document_archive.
Cementing report filed. A W-15 alone is technical cementing context and is not treated as a plugged-well record without W-3 or other plugging support.
Cementing report filed. A W-15 alone is technical cementing context and is not treated as a plugged-well record without W-3 or other plugging support.
Cementing report filed. A W-15 alone is technical cementing context and is not treated as a plugged-well record without W-3 or other plugging support.
Cementing report filed. A W-15 alone is technical cementing context and is not treated as a plugged-well record without W-3 or other plugging support.
G-10 gas well status report
Cementing report filed. A W-15 alone is technical cementing context and is not treated as a plugged-well record without W-3 or other plugging support.
Cementing report filed. A W-15 alone is technical cementing context and is not treated as a plugged-well record without W-3 or other plugging support.
Grouped from highly similar texas technical well document activity records by API, event date, source form, operator, county, field, and event type. Source trace: rrc_document_archive.
G-10 gas well status report
Test date May 1, 2026-10. 24-hour test: gas 9266 mcf, condensate/oil 23 bbl, water 2492 bbl. Gas/liquid ratio 60 cf/bbl. Gas specific gravity 0.641. Flowing tubing pressure 1931 psia. Casing pressure 30 psia. Shut-in wellhead pressure 40 psia. Separator pressure 1183 psia. Choke size 44/64.
Cementing report filed. A W-15 alone is technical cementing context and is not treated as a plugged-well record without W-3 or other plugging support.
Cementing report filed. A W-15 alone is technical cementing context and is not treated as a plugged-well record without W-3 or other plugging support.